INSIGHT · AI GOVERNANCE & COMPLIANCE
Construction sign-offs name a person.
The rules we read are silent on AI.
Can AI sign off construction compliance in Australia? The instruments we read on 2 November 2026 never mention AI. They place each declaration on a named kind of person, among them a registered design practitioner in NSW, an inspecting person in Queensland, a registered practitioner in Victoria, a building surveyor in WA and Tasmania, a certifier in the ACT, a building certifier in the NT. They do not address drafting software, and silence is neither a ban nor a permission. Building Commission NSW's pages do say who may prepare designs and declarations, and they speak of people. The practical question is what record shows what the signing person saw, and when.

Analysed 2 November 2026 · Building Commission NSW pages last updated 8 September, 2 September and 29 October 2026 · Building Regulation 2021 (Qld), current from 14 August 2026 · Professional Engineers Act 2002 (Qld), current from 1 July 2024 · BIF Act 2017 (Qld), current from 28 April 2026 · Building Act 1993 (Vic), Authorised Version No. 152 · Energy Safe Victoria · Building Act 2011 (WA), as at 28 May 2026 · Building Act 2016 (Tas), version current from 5 June 2026 · Occupational Licensing Act 2005 (Tas), version current from 1 July 2025 · Building Act 2004 (ACT), Republication No 56, effective 1 October 2026 · Building Act 1993 (NT), as in force at 10 February 2026 · Electronic Transactions Act 1999 (Cth), Compilation No. 4. South Australia: not verified (2 Nov 2026).
Key takeaways
- No instrument we read mentions AI: The legislation and regulator pages read on 2 November 2026 for NSW, Queensland, Victoria, WA, Tasmania, the ACT and the NT do not refer to artificial intelligence. We do not read silence as a ban or as approval.
- The declaration sits on a named kind of person: WA's Building Act 2011 s 19(3) requires a statement "of the building surveyor signing the certificate". Queensland's Building Regulation 2021 s 53 requires a certificate "signed by the inspecting person".
- NSW separates developing a design from declaring it: Building Commission NSW's design obligations page, last updated 8 September 2026, says "you don't have to be registered to develop the designs; only the supervising designer who will sign off on the design compliance declaration needs to be registered". Its classes and roles page says "Design practitioners must be registered to prepare regulated designs and design compliance declarations". Both speak of people, not software, and we did not read the Act.
- Some sign-offs turn on an act, not a document: Victoria's Building Act 1993 s 238(2) bars a certificate for building work unless it states the practitioner "has inspected that building work". Queensland's Regulation s 52(2) requires the inspecting person to inspect the stage, although s 52(4) lets them accept and rely on an aspect inspection certificate or QBCC licensee certificate for an aspect, subject to s 52(5). The texts place these steps on the person named and are silent on tools.
- We would record what the signer saw, and when: A system-design recommendation, not a legal requirement: the version signed, who or what drafted it, what the signer opened, what they inspected, and the time of each.
01
Who each instrument places
the declaration on.
The Australian construction sign-offs we read on 2 November 2026 place each declaration on a defined person or business, and none of those instruments addresses AI. In the fifth column, "silent" means the text read says nothing about who or what may prepare a draft.
A row names the instrument's placement of the declaration. It does not answer whether a tool may prepare a draft, which these texts do not address, and it is not a statement of every person's duty under the instrument.
| State | Sign-off | The instrument places the declaration on | What is declared | Drafting aids | Instrument and version read |
|---|---|---|---|---|---|
| NSW | Design compliance declaration | A registered design practitioner | That a building practitioner following the designs will comply with the Building Code of Australia (regulator's summary). Applies to regulated designs on class 2, 3 and 9c buildings, with exclusions | One page says a person need not be registered to develop the designs; the other says design practitioners must be registered to prepare regulated designs and declarations. Silent on software | Building Commission NSW design obligations page, last updated 8 September 2026, and classes and roles page, last updated 29 October 2026. Act not read |
| NSW | Building compliance declaration | A building practitioner, which can be an individual or a body corporate. "An appropriate practitioner cannot make or lodge" one | That building work has been constructed in accordance with the declared designs and otherwise complies with the Building Code of Australia. Class 2, 3 and 9c buildings, with exclusions | Silent | Building Commission NSW classes and roles page, last updated 29 October 2026. Act not read |
| NSW | Certificate of Compliance for Electrical Work | The licensed electrician submits it. The qualified person who conducts the safety and compliance test gives the test certificate | The work and the test, within 7 days of completion | Silent | Building Commission NSW advisory note, last updated 2 September 2026. Act not read |
| Queensland | Certificate of inspection (Form 16) | The inspecting person: a building certifier, or a competent person (inspection) | The reasons they are satisfied the stage complies, and how far they relied on tests, specifications, rules, standards, codes or other publications | Silent | Building Regulation 2021 ss 51 to 53, current from 14 August 2026 |
| Queensland | Design-specification certificate (Form 15, compliance certificate for building design or specification) | A competent person (design-specification), an individual the certifier decides is competent | That a design or specification will comply with the building assessment provisions | Silent | Building Regulation 2021 ss 34, 38 and 73, current from 14 August 2026 |
| Queensland | Aspect certificate, QBCC licensee (Form 43) | A QBCC licensee, for a single detached class 1a or class 10 building | That the aspect work complies with the approval | Silent | Building Regulation 2021 ss 68 to 71, current from 14 August 2026 |
| Queensland | Payment schedule | The respondent to the payment claim | Identifies the claim and states the amount proposed and, if less than claimed, why; within the contract period or 15 business days, whichever ends first. Not required if the claim is paid in full by the due date (s 76(2)) | Silent. The duty sits on a party, not on a licensed person | BIF Act 2017 ss 69 and 76, current from 28 April 2026 |
| Victoria | Certificate relied on by a building surveyor | A registered building practitioner in a prescribed category or class, not a provisionally registered one (s 238(3)), or an endorsed building engineer | That proposed building work, or building work, of a prescribed class complies with the Act or regulations. For building work, that the certifier "has inspected" it | Silent | Building Act 1993 s 238, Authorised Version No. 152. Prescribing regulations not read |
| Victoria | Certificate of Electrical Safety | A registered electrical contractor or licensed electrical worker. Prescribed work is inspected by a licensed electrical inspector | Details of the work done. "The licensed electrical worker must sign the certificate of compliance section" | Silent | Energy Safe Victoria pages and COES Fundamentals (January 2024). Act not read |
| WA | Certificate of design compliance | The building surveyor signing it, who must be entitled to sign and independent (s 20(1)(d)) | That the building, if completed under the specified plans and specifications, will comply with each applicable building standard | Silent. Regulations may set what a surveyor must do before signing (s 19(6)); not read | Building Act 2011 ss 19 and 20, as at 28 May 2026 |
| WA | Certificates of construction and building compliance | A building surveyor, in an approved form | The compliance statements the sections set | Silent | Building Act 2011 ss 56 and 57, as at 28 May 2026 |
| SA | Statement of Compliance | not verified (2 Nov 2026) | not verified (2 Nov 2026) | not verified (2 Nov 2026) | Official pages blocked direct reading on 2 November 2026 |
| Tasmania | Certificate of final inspection (building), permit building work | A building surveyor: a building services provider engaged by the owner and licensed for the function, not excluded by s 28(2), or a person under a Minister's notice (ss 28, 29(1)). The permit authority may then issue the certificate of completion on application (s 153) | May issue if the surveyor has "inspected the permit building work" (s 149) on completion of the final notification stage, has received a standard of work certificate (see s 152(1A)), and is satisfied it is completed and complies with the Act and National Construction Code "in so far as it is reasonably practicable to inspect" (s 152(1)). Section 149(2): may inspect or "cause the work to be inspected" | Silent | Building Act 2016 ss 28, 29, 149, 152 and 153, version current from 5 June 2026. Regulations, guidelines and approved forms not read |
| Tasmania | Certificate of completion (notifiable building work) | The relevant building surveyor, on application (s 104(1)) | May only issue if satisfied the work was performed in accordance with the Act, the building administration fee is paid and any notifiable plumbing work has its certificate of completion (s 104(3)). Missing standard of work certificate: s 104(3A), (3B). May inspect under the Director's guidelines (s 100); is to specify when completed work is inspected (s 102(2)) | Silent | Building Act 2016 ss 100, 102 and 104, version current from 5 June 2026. Regulations, guidelines and approved forms not read |
| Tasmania | Standard of work certificate (building work) | The responsible person: the licensed builder or, if there is none, the owner (s 5(1)) | The sections read require it in an approved form, within the prescribed period after completion, and do not state its contents. It goes to the building surveyor, copied to the owner. Notifiable work is "only completed after" a s 100 inspection and the person inspecting is satisfied it complies (s 103(3)) | Silent | Building Act 2016 ss 5, 103 and 151, version current from 5 June 2026. Regulations and approved forms not read |
| Tasmania | Certificate for prescribed work (licence holder) | The responsible licence holder, where the Administrator of Occupational Licensing requires it in accordance with the regulations | On completion of the work, that the prescribed work complies with the relevant code of practice (s 54(1)). A licence holder must comply with the requirement (s 54(2)) | Silent | Occupational Licensing Act 2005 s 54, version current from 1 July 2025. Regulations not read |
| ACT | Stage certificate (work complies with s 42) | The certifier appointed for the work: a licensed construction practitioner entitled under the Construction Occupations (Licensing) Act 2004 and qualified under the regulations (s 18), without an interest in the work (s 23) | On the licensee's stage notice that the work accords with approved plans (s 43(2), (5)), the certifier "must inspect the building work as soon as practicable" (s 44(1)). As soon as practicable after inspection, and within 2 working days, must give a non-compliance notice or, if satisfied on reasonable grounds it complies with s 42, certify (s 44(2); see s 44(5)). A regulation may prescribe stages and exceptions (s 43(1)) | Silent | Building Act 2004 ss 17A, 18, 23, 43 and 44, Republication No 56, effective 1 October 2026. Regulation and approved forms not read |
| ACT | Completion certificate to the registrar | The certifier, who may require the owner to give an engineer's certificate on the s 47(3) ground. The engineer must be in the relevant field and, where registration is required, a professional engineer (s 47) | Must give, within 7 days after being satisfied on reasonable grounds, a certificate that the work was completed in accordance with the Act and in, or substantially in, accordance with the approved plans, or the prescribed certificate where s 48(1)(b)(ii) applies (s 48(3)(h)). Without a s 47(1)(a) certificate, a written statement on structural sufficiency (s 48(3)(j)) | Silent | Building Act 2004 ss 47 and 48, Republication No 56, effective 1 October 2026. Regulation and approved forms not read |
| ACT | Certificate of occupancy | The construction occupations registrar, on the land owner's application. The registrar may have regard to certificates and documents the certifier gives under s 48 (s 67) | The registrar must issue it if satisfied the work was completed in accordance with the prescribed requirements and the building is fit for occupation and use as the class in the approved plans, plus s 69(1)(c), (d). Other certificates: s 69(2), (2B), (3). It does not affect anyone's liability to comply with a territory law (s 68). An explanatory note to s 69(4): no physical inspection required unless a regulation prescribes it | Silent | Building Act 2004 ss 66 to 69, Republication No 56, effective 1 October 2026. Regulation not read |
| NT | Inspection certificate | A building certifier, an individual or corporation registered in that category (s 4), or the Director | Must issue it "after inspecting building work" and on being satisfied it was, in all material respects, carried out in accordance with the Regulations (s 63(5)). After the final inspection stage, also that it is completed, any directions are complied with and it complies in all material respects (s 63(6)). Approved form (s 63(7)). May inspect on notice of a completed stage (s 63(1)). May rely on certificates listed in s 40, including a building practitioner's and another certifier's | Silent | Building Act 1993 ss 4, 40, 62 and 63, as in force at 10 February 2026. Regulations and approved forms not read |
| NT | Occupancy permit | A building certifier (s 38(1)(a)), on application by the owner or owner's agent (s 67). Subject to Part 4, s 38(2) bars anyone else from performing the s 38(1) functions | Not granted unless the building or part is suitable for occupation and complies in all material respects with the Regulations (s 70(1)), and the s 70(2) documents and criteria are met | Silent | Building Act 1993 ss 38, 67 and 70, as in force at 10 February 2026. Regulations not read |
| NT | Builder's declaration | The "natural person" who carried out the building work or was in charge of carrying it out (s 69(2)), or another natural person under a provision for corporations (s 69(3)) | That the building work has been carried out in accordance with the building permit, in an approved form. No occupancy permit without it unless an exemption certificate applies (s 69(1), (7)). No false statement (s 69(4)). 14 day limits for prescribed building contractors and owner-builders: ss 48C, 48G | Silent | Building Act 1993 ss 48C, 48G and 69, as in force at 10 February 2026. Approved form not read |
02
Drafting, declaring and doing
are three separate questions.
A construction sign-off under the instruments read on 2 November 2026 can be split into three questions: who may prepare the words, who declares them, and what the declarer must have done first. The provisions read speak to who declares and what the declarer must have done first, and Queensland's Professional Engineers Act also limits who may carry out engineering services. None mentions AI.
| Instrument wording | Source | What the text places on whom |
|---|---|---|
| "signed by the inspecting person" | Building Regulation 2021 (Qld) s 53(2)(b) | Places the signature on the inspecting person. Silent on who or what prepares the wording |
| "the reasons the inspecting person is satisfied" | Building Regulation 2021 (Qld) s 53(2)(c)(i) | Places the stated reasons on the inspecting person. Silent on who or what words them |
| "the extent to which the inspecting person has relied on" | Building Regulation 2021 (Qld) s 53(2)(c)(ii) | Places on the inspecting person an account of reliance on tests, specifications, rules, standards, codes of practice or other publications. The list does not name software |
| "has inspected that building work" | Building Act 1993 (Vic) s 238(2) | Bars the practitioner or endorsed engineer from giving a certificate for building work unless it states they have inspected that work |
| "must inspect the stage"; "in accordance with best industry practice" | Building Regulation 2021 (Qld) s 52(2) and (3) | Places the inspection on the inspecting person, to a stated standard. Under s 52(4) and (5) they may instead accept and rely on an aspect inspection certificate or QBCC licensee certificate for an aspect, with a limit on the final stage of class 1a and class 10 work |
| "the building surveyor signing the certificate" | Building Act 2011 (WA) s 19(3) | Places the statement on the surveyor signing. For a building permit, s 20(1)(d) requires that surveyor to be entitled to sign and independent |
| "A person who is not a practising professional engineer must not carry out professional engineering services" | Professional Engineers Act 2002 (Qld) s 115(1), with a direct supervision exception in s 115(2) | Places the services on a practising professional engineer, or a person the engineer directs, oversees and evaluates and who works under that engineer's responsibility (s 115(2), (5)). The text speaks of a person and does not mention software |
03
AI code checks, contract review
and the person the text still names.
AI building code checks and AI contract review are not addressed by the instruments we read on 2 November 2026. A tool can produce a findings list or a clause summary, and the text still places any resulting declaration or response on the person or party it names.
A contract may add its own sign-offs, such as a superintendent's certificate under a standard form. Those are contract terms, not statute, and we did not read any standard form text. Check the contract in front of you.
| AI use | What it produces | Who the text still names | Label |
|---|---|---|---|
| Reading drawings against building rules | A draft list of possible issues, with sheet references | The designer or surveyor who declares or certifies, as in the table above | Our design. Our page on AI reading drawings covers published accuracy limits |
| Drafting a certificate or inspection report | Pre-filled fields and wording | The person who signs. In Queensland, s 40 of the Regulation also bars a competent person giving the certifier a document they know or reasonably suspect is false or misleading in a material particular | Our design; the s 40 duty is required by the Regulation |
| Contract review | Clause summary and a list of questions | The party to the contract and its adviser. No instrument read addresses this use | Our design |
| Drafting a payment schedule | Draft amount and reasons | The respondent (BIF Act 2017 (Qld) s 76) | Required by (the schedule); the draft step is our design |
| A human in the loop policy | A written rule on who reviews what | National AI Centre Foundations: "mandatory human review for high-stakes decisions" | Suggested by guidance |
04
The record:
what the signing person saw, and when.
The instruments read on 2 November 2026 fix the certificate and rarely the working record behind it.
| Field | What it holds | Why it matters | Label |
|---|---|---|---|
| Sign-off and instrument | Which certificate, under which section, for which stage | Sets who may sign and what must be stated | Our design |
| Signer and authority | Name, role, registration or licence reference, as checked on the day | The instruments tie the sign-off to a kind of person | Our design, supporting the instrument's placement |
| Reasons and reliance | The stated reasons and the publications relied on | Queensland requires these on the certificate | Required by s 53(2)(c) of the Regulation (Qld certificate of inspection) |
| Competent person decision | The certifier's record of the decision | Queensland requires the certifier to keep it for at least 7 years (s 36(2)) | Required by s 36 of the Regulation (Qld) |
| Inspection event | Date, time, place, what was inspected, by whom, with photos | Where the text turns on an inspection, this is the evidence it happened | Our design, supporting s 238(2) (Vic) and s 52 (Qld) |
| Drafter | Who or what prepared the draft: person, tool and version | Separates drafting from declaring | Our design |
| Draft as produced | The unedited draft, with time | Shows what the person changed | Our design |
| What the signer opened | Documents and versions opened, with times | Shows what they saw before signing | Our design |
| Signed version and signature event | The exact file signed, the time, and how the person was identified | For Commonwealth law, s 10 of the Electronic Transactions Act 1999 asks for a method to identify the person and indicate their intention | Our design; state signature laws not read |
| Copy kept | Where the certificate is held, and until when | Queensland electrical contractors keep a copy for 5 years, per Business Queensland (page last updated 30 November 2017) | Required (Qld electrical, regulator's summary; Regulation not read). Other periods not surveyed |
What we would put in a system
A system-design recommendation for a business that uses AI to prepare sign-off paperwork.
Where agents help here is narrow. An agent can pre-fill a form, list the documents behind it and flag what is missing, and the named person confirms or rejects it. In this design, no agent decides that work complies, makes a declaration, or signs. Our page on how we deploy AI sets out our general approach.
| Field | Why it is load-bearing |
|---|---|
| A hard stop before signature | The signing person's action should be a separate recorded step, never a side effect of generating a document. |
| Signer's own credentials, not a shared login | A shared account cannot show which person made the declaration. |
| Version lock at signing | A later edit should create a new version, so the signed text stays fixed. |
| An inspection event linked to the certificate | Where a text turns on an inspection, the certificate should point to it. |
- AI audit trail for construction records: The record of one AI-assisted decision, each field labelled by where it comes from.
- How we deploy AI: What an agent may read, what it may produce, who confirms it and what gets logged.
- AI reading construction drawings: What published tests show about text, symbols and counts.
- NSW digital work systems duties: Passed in February 2026, with the duties not commenced.
Questions worth asking
of your own sign-offs
For a registered practitioner: on your last declaration, can you show what you opened before signing?
The NSW, Queensland, Victorian, WA, Tasmanian, ACT and NT texts we read place the declaration on the person who makes it. Keeping the document versions and times opened is our design suggestion. General information as read on 2 November 2026, not legal advice.
For a Queensland certifier: when a tool helps word a certificate of inspection, are the reasons still your own?
Section 53(2)(c) of the Building Regulation 2021 requires the certificate to state the reasons the inspecting person is satisfied. The section is silent on tools. General information as read on 2 November 2026, not legal advice.
For a builder's project manager: who in your business can press the final send on a payment schedule?
Section 76 of the BIF Act 2017 (Qld) places the response on the respondent, with a 15 business day outer limit unless the contract period is shorter. Who approves the draft inside the business is a choice to record. General information as read on 2 November 2026, not legal advice.
For a principal engineer: does your tool's output count as work you directly supervised?
Section 115 of the Professional Engineers Act 2002 (Qld) speaks of a person carrying out services under direct supervision, and does not mention software. How it applies to a tool is not determined here. Ask your adviser or the board. General information as read on 2 November 2026, not legal advice.
Questions people ask
about AI and construction sign-offs
Can AI sign off building code compliance in Australia?
The NSW, Queensland, Victorian, WA, Tasmanian, ACT and NT instruments we read on 2 November 2026 do not mention AI. They place each declaration on a named kind of person, such as a building surveyor in WA or an inspecting person in Queensland. None describes a tool making the declaration. South Australia was not verified.
Is AI banned in construction certification?
No instrument we read on 2 November 2026 bans AI or approves it. The texts for NSW, Queensland, Victoria, WA, Tasmania, the ACT and the NT are silent on AI. Silence does not move a declaration: the text still places it on the person it names, and some sign-offs turn on an inspection.
Can an AI tool draft a design compliance declaration in NSW?
Building Commission NSW's pages do not address AI or software. Its design obligations page, last updated 8 September 2026, says only the person signing off and declaring the design needs to register, and that you do not have to be registered to develop the designs. Its classes and roles page, last updated 29 October 2026, says design practitioners must be registered to prepare regulated designs and design compliance declarations. We did not read the Design and Building Practitioners Act, so the position of a tool is not determined here.
What must a Queensland certificate of inspection state?
Under s 53(2) of the Building Regulation 2021 (Qld), current from 14 August 2026, the certificate is in the approved form, signed by the inspecting person, and states the reasons they are satisfied and the extent to which they relied on tests, specifications, rules, standards, codes of practice or other publications.
What is a human in the loop policy for a construction business?
A human in the loop policy says which AI outputs a named person must review before they are used. The National AI Centre's Foundations guidance calls for mandatory human review for high-stakes decisions and for human override points. It is voluntary guidance. Each statutory sign-off still follows its own instrument.
Can AI review a construction contract?
A tool can summarise clauses, and no instrument we read on 2 November 2026 addresses that use. The parties remain bound by the contract, and a respondent must still give any payment schedule the security of payment law requires. A summary is not legal advice. General information only.
What this analysis
does and does not show.
Evidence note
- What it shows
- Who the NSW, Queensland, Victorian, WA, Tasmanian, ACT and NT sources read on 2 November 2026 name for a set of construction sign-offs, what each says is declared, that those texts are silent on AI, and a record design with each field labelled as required by, suggested by guidance or our design.
- Key facts quoted
- Qld Building Regulation 2021 s 53(2): "signed by the inspecting person"; Vic Building Act 1993 s 238(2): "has inspected that building work"; WA Building Act 2011 s 19(3): "the building surveyor signing the certificate"; Building Commission NSW: "only the supervising designer who will sign off on the design compliance declaration needs to be registered"; Tas Building Act 2016 s 152(1): "in so far as it is reasonably practicable to inspect"; ACT Building Act 2004 s 44(1): "must inspect the building work as soon as practicable"; NT Building Act 1993 s 69(2): "natural person"; BIF Act 2017 (Qld) s 76: 15 business days.
- NSW Acts were not read. The NSW legislation register blocks automated access, so NSW rows rest on Building Commission NSW's pages, which summarise the law.
- South Australia's Statement of Compliance sources blocked direct reading on 2 November 2026. That row is not verified, and no inference is drawn from it.
- The Tasmanian, ACT and NT Acts read were searched whole on 2 November 2026 for "artificial intelligence", "AI", "machine learning", "automated", "automation", "algorithm", "software" and "computer". The only match was "computer database", for the registers the Administrator keeps, in s 50(1) of Tasmania's Occupational Licensing Act 2005.
- Silence is limited to the sections and pages read. Regulations, practice notes and codes we did not read may say more. That includes Victoria's prescribing regulations, WA's regulations under s 19(6), the Qld Electrical Safety Regulation 2013, Tasmania's regulations, guidelines and approved forms under the Building Act 2016 and Occupational Licensing Act 2005, the ACT's regulation, approved forms and Construction Occupations (Licensing) Act 2004, and the NT's Building Regulations 1993 and approved forms. Those may add a step or a signature.
- State electronic transactions Acts were not read. Section 10 of the Commonwealth Act covers requirements under Commonwealth law only.
- No standard form contract and no Australian Standard text was read or quoted.
- The table is not a complete list of sign-offs.
- General information, not legal, certification or WHS advice. Nothing here says a tool may or may not be used for any task, or that a given certificate is valid.
What to watch next
We found no publisher-announced date for an AI-specific sign-off rule in the instruments read.
- 10 December 2026: APP 1.7 to 1.9 commence for privacy policies. Our page on the AI audit trail covers what that means for records.
- Late 2026: SafeWork NSW Stage 2: SafeWork NSW says further targeted consultation on the digital work systems guidelines will occur in late 2026. The remaining provisions commence on a date or dates to be announced.
Bring us one sign-off
you had to reconstruct.
Send us one certificate or declaration where someone later asked what the signer saw. We will show you which records already exist, which are missing, and where a draft and its signature come apart.
General information about published legislation and regulator pages, as read on 2 November 2026. Not legal, certification or WHS advice. South Australia not verified.
Sources
Suggested citation: Building Regulation 2021 (Qld) s 53; Building Act 1993 (Vic) s 238; Building Act 2011 (WA) ss 19, 56; Building Commission NSW, Design practitioner obligations (last updated 8 September 2026); as read 2 November 2026. Derived figures: none.
- Building Commission NSW - Design practitioner obligations: Last updated 8 September 2026 · read 2 November 2026 · Regulator page
- Building Commission NSW - Building classes and roles of professionals: Last updated 29 October 2026 · read 2 November 2026 · Regulator page
- Building Commission NSW - When to submit a CCEW: Last updated 2 September 2026 · read 2 November 2026 · Regulator advisory note
- Queensland Legislation - Building Regulation 2021: Current version from 14 August 2026 · read 2 November 2026 · Legislation register
- Business Queensland - Building forms: Read 2 November 2026 · Government forms list
- Queensland Legislation - Professional Engineers Act 2002: Current version from 1 July 2024 · read 2 November 2026 · Legislation register
- Queensland Legislation - Building Industry Fairness (Security of Payment) Act 2017: Current version from 28 April 2026 · read 2 November 2026 · Legislation register
- Business Queensland - Electrical contractor safety duties: Last updated 30 November 2017 · read 2 November 2026 · Government summary
- Victorian Legislation - Building Act 1993: Authorised Version No. 152 · read 2 November 2026 · Legislation (PDF)
- Energy Safe Victoria - Certificates of Electrical Safety: Reviewed 17 September 2026; COES Fundamentals January 2024 · read 2 November 2026 · Regulator page
- Western Australian Legislation - Building Act 2011: As at 28 May 2026 · read 2 November 2026 · Legislation (PDF)
- Tasmanian Legislation - Building Act 2016: Version current from 5 June 2026 · read 2 November 2026 · Legislation register
- Tasmanian Legislation - Occupational Licensing Act 2005: Version current from 1 July 2025 · read 2 November 2026 · Legislation register
- ACT Legislation Register - Building Act 2004: Republication No 56, effective 1 October 2026 · read 2 November 2026 · Legislation register
- Northern Territory Legislation - Building Act 1993: As in force at 10 February 2026 · read 2 November 2026 · Legislation (PDF)
- Federal Register of Legislation - Electronic Transactions Act 1999: Compilation No. 4, C2026C00011 · read 2 November 2026 · Legislation register
- National AI Centre - Guidance for AI adoption: foundations: No date on the web page · read 2 November 2026 · Government guidance
RELATED READING
Other readings on the same records.
- NSW passed digital work system duties in February. None has commenced: Assent 18 Feb 2026; only Schedule 1 [7], [9] and [11] commenced. The s 19 and s 21A duties and the entry permit power wait for proclamation (as at 19 Oct 2026). (AI Governance & Compliance)
- AI reads the text on a drawing well. It still miscounts the doors: On AECV-Bench (2026), top models scored 0.7 to 0.95 reading drawing text; the best door count was 0.39 exact match on 120 floor plans, windows 0.34. (AI Governance & Compliance)
- Construction fatalities in Australia: the count, the rate and the revisions: Safe Work Australia: 41 construction worker fatalities in 2025, rate 3.0 per 100,000. Why the same year reads differently in each release. (Licensing & Compliance)